Property Highlights:
Customizable new class A buildings
Rail Access to most buildings
Truck access and ample truck parking / IOS throughout complex
From 89,250 SF to 2,015,000 SF building available
Heavy power and water capacity
Located near Hwy 17 and Hwy 60 in Frostproof, Florida
Workforce available nearby
Maximized Rail Site Plan:
The Maximized Rail site plan offers up to 10 custom-built spaces, ranging from 130,000 to 942,500 square feet. Six of these buildings feature direct rail access, with tracks leading right to the doors, streamlining logistics effortlessly.
Fully customizable
130,000 to 942,500 SF
Six buildings with direct rail access
IOS available on site
Rear-load or cross-dock
Dock high and drive-in access
30' to 40' clear height
ESFR wet sprinklers
3ph, 480v, 2,000Amps + (25 MW capacity)
Individual User Site Plan:
The Individual User site plan includes up to 11 custom-built warehouses, ranging from 89,250 to 942,500 square feet. These buildings will have limited access to the railways, providing essential connectivity where needed.
Fully customizable
89,250 to 942,500 SF
Direct rail access available
IOS available on site
Rear-load or cross-dock
Dock high and drive-in access
30' to 40' clear height
ESFR wet sprinklers
3ph, 480v, 2,000Amps + (25 MW capacity)
Bulk Distribution Site Plan:
The Bulk Distribution site plan offers 4 custom-built warehouses, each ranging in size from 725,000 to 2,015,000 square feet. Among these, 3 warehouses are equipped to accommodate rail access, enhancing their operational flexibility and efficiency.
Fully customizable
725,000 to 2,015,000 SF
Three buildings with direct rail access
IOS available on site
Rear-load or cross-dock
Dock high and drive-in access
30' to 40' clear height
ESFR wet sprinklers
3ph, 480v, 2,000Amps + (25 MW capacity)
Electricity: Supplied by Duke Energy, our park is served by two robust 12.47-kV distribution lines and a 69-kV transmission line, ensuring reliable power across the park. The nearest substation offers a substantial capacity of 25 MW, catering to high-power requirements and future expansions.
Water Services: Managed by the City of Frostproof, our facilities benefit from a 12-inch waterline with an excess capacity of 450,000 gallons per day (GPD), providing more than adequate water supply for your operational needs.
Wastewater Management: Also provided by the City of Frostproof, our park is equipped with a 4-inch wastewater line. This system supports an excess capacity of 250,000 GPD, facilitating efficient waste management and sustainability practices.
Natural Gas: TECO People’s Gas supplies natural gas with available capacity for light industrial use. Extensions of the gas line can be accommodated to meet specific energy requirements, ensuring flexibility and scalability for growing businesses.
Telecommunications: With fiber-optic infrastructure adjacent to our site, connectivity can be readily extended into each facility, offering high-speed internet and telecom services to keep your business connected and competitive.
3-D Rendering